1100 Re:naissance

Results

Reduction in energy consumption

Energy savings

Background

12,314 Sq Ft

A serviced office building in Basingstoke integrated IBOS into the whole building’s infrastructure, including the Building Management System (BMS), central plant, chillers, boilers, Air Handling Units (AHUs), Low-Temperature Hot Water (LTHW) systems, and extract fans.

Energy metering data is captured for analysis.

IBOS wireless indoor air quality sensors were installed throughout the building, enabling real-time air quality monitoring and immediate response capabilities.

IBOS ‘Engage’ occupier App to be installed for occupier engagement.

Insights

The identification of incorrect dead bands and set points commissioned on the Variable refrigerant flow (VRF) system revealed the cause of significant out-of-hours energy consumption.

Systems Integrated

Building Management System (BMS)

Centralised control and monitoring

Central Plant

Key energy production and distribution systems

Chillers and Boilers

Temperature regulation and heating systems

Air Handling Units (AHUs)

Air distribution and quality control.

Low-Temperature Hot Water (LTHW) Systems

Efficient heating distribution.

Extractor Fans

Ventilation and air quality management.

  • Broadway Shopping Centre

    Read Case Study

  • Putney Exchange Shopping Centre

    Read Case Study

  • Witan Gate House

    Read Case Study