Portwall Place

Results

Reduction in energy consumption

Energy savings

of energy saved

Reduction since installation

Background

171,544 Sq Ft

A corporate office block in central Bristol integrated IBOS into the whole building’s infrastructure, including the Building Management System (BMS), central plant, chillers, boilers, Air Handling Units (AHUs), Low-Temperature Hot Water (LTHW) systems, and extract fans.

Insights

The identification of the building plant operating outside of set parameters revealed the cause of out-of-hours energy usage. As a result, plant run times were restricted to aid in energy reduction. 

Additionally, issues with the setup of the boiler and chiller systems were identified, allowing for more efficient use of these systems and a consequent reduction in energy consumption.

“I can confidently say that integrating IBOS into this office has been transformative. It has optimised our building systems, leading to substantial improvements in energy efficiency, cost savings, and environmental performance; a key step towards our client’s Net Zero goals.” Property Manager

Systems Integrated

Building Management System (BMS)

Centralised control and monitoring

Central Plant

Key energy production and distribution systems

Chillers and Boilers

Temperature regulation and heating systems

Air Handling Units (AHUs)

Air distribution and quality control.

Low-Temperature Hot Water (LTHW) Systems

Efficient heating distribution.

Extractor Fans

Ventilation and air quality management.