Import Building

Results

Reduction in energy consumption

Energy savings

of energy saved

Reduction since installation

Background

281,331 Sq Ft

Corporate office space in East London has integrated IBOS into the whole building’s infrastructure, including the Building Management System (BMS), central plant, chillers, boilers, Air Handling Units (AHUs), Low-Temperature Hot Water (LTHW) systems, and extract fans.

Insights

The cause of the large out-of-hours energy usage was identified and as a result , optimisation rules were implemented to reduce this energy consumption during non-operational hours. 

Further optimisation rules were subsequently applied to enhance energy efficiency, which included the optimisation of the running times of the plant. 

Additionally, efficiencies were identified to reduce the impact on energy consumption due to the 24/7 occupation of a single floor in the building.

“The savings in the first year achieve 100% payback of installation costs within two weeks. A year later, the system delivers a 20% annual saving on building energy consumption, reducing costs by £434 k compared to the previous year.” – Trilogy

Systems Integrated

Building Management System (BMS)

Centralised control and monitoring

Central Plant

Key energy production and distribution systems

Chillers and Boilers

Temperature regulation and heating systems

Air Handling Units (AHUs)

Air distribution and quality control.

Low-Temperature Hot Water (LTHW) Systems

Efficient heating distribution.

Extractor Fans

Ventilation and air quality management.